Bunn JDF-4D, JDF-4SB manual SERVICE CONT Circulation Pump all Models

Models: JDF-4D JDF-4SB JDF-4S

1 57
Download 57 pages 43.05 Kb
Page 29
Image 29
SERVICE (CONT.)

SERVICE (CONT.)

Circulation Pump (all Models)

FIG. 31 CIRCULATION PUMP

Location:

The Circulation Pump is located on top of the water bath tank cover.

Test Procedure:

1.Disconnect the dispenser from the power source.

2.With a voltmeter .

If voltage is present as described, proceed to step 4. If voltage is not present as described, refer to the Wiring Diagrams and check the dispenser wiring harness back to the transformer (See TRANSFORMER).

Removal and Replacement:

1.Remove dispense platform(s) for ease of taking out recirculating pump.

2.Remove left and right side panels.

3.Remove silicone condensation hose out of bath tank along side recirculating pump.

4.Disconnect pump motor and condenser fan wires (1/4” spade terminals).

5.Remove 2 screws left and right side of the condenser mounting bracket. Remove condenser fan assembly out the right side of the machine.

6.Release recirculating pump holding bracket right side (2 nuts).

7.Lift up on recirculating pump and maneuver out the right side of the machine

RED/BLK to

Compressor Switch

WHI to Transformer

P3250.25

FIG. 32 CIRCULATION PUMP

29

49179

110613

 

Page 29
Image 29
Bunn JDF-4D, JDF-4SB manual SERVICE CONT Circulation Pump all Models