Hardware Installation

9.Connect the free end of the Ethernet cable to a hub, switch, patch panel, Power over Ethernet power injector, or an Ethernet port on a computer.

10.If using AC power, connect the power cord to a power source (such as a wall outlet) to turn on the unit.

11.Configure and test the unit. See Initialization for details.

12.Download the latest software to the unit, if necessary. See Download the Latest Software for details.

13.Place the unit in the final installation location. See Mounting Options for mounting options and instructions.

NOTE:

Avaya recommends that you perform a Site Survey prior to determine the installation location for your AP units. For information about how to conduct a Site Survey, contact your local reseller.

14.Replace the back cover, front cover, and cable cover. Be careful to avoid trapping the power and Ethernet cables when replacing the cable cover.

Avaya Wireless AP-4/5/6 User’s Guide

2-15

Page 45
Image 45
Avaya AP-4, AP-6, AP-5 manual Hardware Installation