Bush Hog 5045 manual F E D A C B

Models: 5045

1 56
Download 56 pages 60.88 Kb
Page 50
Image 50
F E

A-Attach to metal line on mainframe that is connected to the Base End of the lift cylinder (color code blue) using a 68” hydraulic hose and adapter provided in kit.

B-Attach to control valve at port that controls Base End of the lift cylinder, (color code blue).

C-Attach to metal line on mainframe that is connected to the Rod End of the lift cylinder (color code red) using a 68” hydraulic hose and adapter provided in kit.

D-Attach to control valve at port that controls Rod End of the lift cylinder, (color code red).

E- Attach one side of TEE to metal line on mainframe that is connected to the Base End of the bucket cylinder (color code green) using a 68” hydraulic hose and adapter provided in kit.

Attach the additional side of TEE to the control valve port that controls the Base End of the bucket cylinder.

F- Attach one side of TEE to metal line on mainframe that is connected to the Rod End of the bucket cylinder (color code yellow) using a 68” hydraulic hose and adapter provided in kit.

Attach the additional side of TEE to the control valve port that controls the Rod End of the bucket cylinder.

Note: Tie the (4) 68” hoses routed to the metal lines from the self leveling valve together with the ties provided in the kit. Use one of the ties to secure the hose bundle to the inside of the pedestal by loop- ing the tie through one of the square holes toward the inside rear of the pedestal and around the hose bundle.

F E

D

A C

B

Page 50
Image 50
Bush Hog 5045 manual F E D A C B