WIRING

WARNING

To reduce the risk of SEVERE INJURY or DEATH:

• DO NOT install ANY wiring or attempt to run the operator

• ANY maintenance to the operator or in the area near the

without consulting the wiring diagram. We recommend that

operator MUST not be performed until disconnecting the

you install an optional reversing edge BEFORE proceeding

electrical power and locking-out the power via the operator

with the control station installation.

power switch. Upon completion of maintenance the area

• ALL power wiring should be on a dedicated circuit and well

MUST be cleared and secured, at that time the unit may be

protected. The location of the power disconnect should be

returned to service.

visible and clearly labeled.

• Disconnect power at the fuse box BEFORE proceeding.

• ALL power and control wiring MUST be run in separate

Operator MUST be properly grounded and connected in

conduit.

accordance with local electrical codes. NOTE: The operator

• BEFORE installing power wiring or control stations be sure to

should be on a separate fused line with a 15 amp

follow ALL specifications and warnings described below.

circuit breaker.

Failure to do so may result in SEVERE INJURY to persons

• ALL electrical connections MUST be made by a qualified

and/or damage to operator.

individual.

 

Connect Gate Operator (Gate 1) to Control Box

1Watertight Connector Nut

Insert operator cable through watertight connector nut.

Watertight Connector Nut

Operator

Cable

2 Insert Operator Cable

Insert watertight connector into the bottom of the control box and tighten with nut. Insert operator cable through watertight connector mounted in the bottom of the control box.

Nut

Watertight Connector

18

30

30

Control Box

Watertight

ConnectorOperator

Cable

Watertight

Connector Nut

 

Can

Cause

ng

Gateor Death

MoviInjury

 

23

Wiring