1Connect second Operator to Control Board (Model Ga420D Only)

Before digging, contact local underground utility locating companies.

Trench across driveway to bury the extension cable.

Use PVC conduit to prevent damage to cables.

Insert extension cable through watertight connector nut and through an available watertight connector mounted in the control box.

Extend cable and wires to GATE 2 connector and connect as shown.

Secure extension cable to control box using watertight connector nut.

CAUTION

To AVOID damaging gas, power or other underground utility lines, contact underground utility locating companies BEFORE digging.

ACCESSORY

R9Ø

 

 

POWER

 

 

 

24V

 

 

Control Box

Brown

 

 

 

 

 

BRN

 

 

 

Green

 

 

Terminal blocks

GRN

 

 

can be removed

White

 

10A 32V

WHT

 

 

to simplify wiring.

Yellow

 

 

YEL

 

 

 

Blue

 

 

 

BLU

 

 

 

Red

 

 

 

RED

 

 

 

GATE 2

 

 

 

 

 

Operator

Extension Cable

R4 C2

R196

Cable

 

D15

 

 

 

24 VAC/

 

PVC Conduit

SOLAR

 

 

Junction Box

Extension Cable

 

PVC conduit at

 

least 18" below

Gate Operator (Gate 2)

ground level

(grade)

 

 

Gate Operator (Gate 1)

PVC conduit (not provided) to protect the power cable and low voltage wire from lawn mowers and string trimmers.

Wiring