
2 Junction Box
The following items are required to complete the junction box (not provided) installation:
•4 x 4 Junction Box with 3/4 NPT threaded port holes
•Screws
•PVC Conduit
Open the junction box by removing screws (4) and set aside.
Mount the junction box within 5' of second operator.
|
|
|
|
|
|
| Junction Box |
|
|
|
|
| Junction Box Cover |
| (not provided) |
Screws (4) |
|
|
|
| |||
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Within 5'
Junction Box
Extension Cable
Gate Operator (Gate 2)
Gate Operator (Gate 1)
Control Box
Within 5' PVC conduit (not provided) to protect the power cable and low voltage wire from lawn mowers and string trimmers.
27 | Wiring |