Route operator cable and extension cable through watertight connector nut and watertight connector. Insert cables and watertight connectors into the holes in the bottom of the junction box (not provided). Feed extension cable through PVC conduit and secure with connector nut.
|
| Junction Box (not provided) |
Operator |
|
|
Cable | Watertight Connector | Watertight Connector |
|
| Extension Cable |
|
| Watertight Connector Nut |
Watertight Connector Nut
Connect Wires in Junction BoxPVC Conduit
4Remove terminals from operator cable. Strip wires and twist like colored wires together with wire nuts.
Wire Nut
Operator Cable
Brown | Brown |
Green | Green |
White | White |
Yellow | Yellow |
| |
Blue | Blue |
| |
Red | Red |
Extension Cable
Put wires inside of junction box. Secure operator and extension cables with watertight nut. Reinstall cover.
Junction Box
Operator Cable
Screws (4)
Extension Cable
Watertight Connector Nut Watertight Connector Nut
Junction Box (not provided)
PVC Conduit
Wiring | 28 |