Instruction Manual | |
|
|
Installation in a Suspended Ceiling (using threaded rods)
You can suspend the lift housing from three
CAUTION: For smooth and reliable operation, the lift must be installed square and parallel in all dimensions. Avoid stressing or twisting the lift at any time during installation.
Install the lift using threaded rods:
1.With the lift in the fully retracted position, remove the closure panel from the bottom of the lift.
2.If you are using the
3.Insert the 3 threaded rods through the top of the lift or
4.Using nuts and washers, secure the lift to the threaded rods. Finish the suspended ceiling:
1.Cut the grid to fit the perimeter of the lift and insert it into the side channel of lift (the side channel of the lift will support the weight of the ceiling grid and tiles).
2.If using the
3.Cut surrounding ceiling tile to appropriate size.
4.Make sure the unit is level, square, parallel and there is no stress applied to the box (chassis).
5.Using the test push button, carefully operate the lift all the way up and down to be sure the clearances are adequate. Be pre- pared to stop the lift immediately if the lift begins to sound labored or one side begins to travel slower.
6.Replace surrounding ceiling tile.
7.With lift at least partway open, remove four screws securing ceiling tile retainer on bottom of tray (see Figure 4) and remove ceiling tile retainer.
8.Cut ceiling tile to fit inside ceiling tile retainer [include grid pieces if necessary (see Figure 5)] and install ceiling tile (grid) by sliding it into the open end of the ceiling tile retainer.
CAUTION: Make sure all parts assemble easily, without distort- ing any parts, when installing tile in the ceiling tray. Any parts protruding from the tray will cause damage when the unit closes.
9.Install ceiling tile retainer and secure using four screws.
Figure 3. Threaded Rod Installation
Figure 4. Remove Ceiling Retainer
SL236 shown with ceiling tile and grid installed in
bottom panel
Figure 5. Grid Intersection
8