Chief Manufacturing SL-236 Connect Power To The Lift, Non Plenum Rated Installation

Models: SL-236

1 24
Download 24 pages 5.39 Kb
Page 11
Image 11
CONNECT POWER TO THE LIFT

Instruction Manual

SMART-LIFT 236 Electric Ceiling Lifts

 

 

CONNECT POWER TO THE LIFT

WARNING: Plenum rating requires hard wiring and use of Class II control wiring. Follow all local building and electrical codes.

NOTE: If the lift is cycled up and down repeatedly, the thermal overload on the motor may stop operation. Operation will resume when the thermal overload cools and resets (5 to 15 minutes).

Non Plenum Rated Installation

1.Plug the lift’s power cord (supplied) into an electrical outlet.

Plenum Rated Installation

WARNING: A licensed electrician should disconnect and terminate the leads to the power cord receptacle and, using the access holes provided for a strain relief, hard wire the unit to a power source.

WARNING: Failure to disconnect and terminate power leads properly may result in equipment damage or personal injury.

1.Disconnect and terminate the electrical leads from the power cord receptacle at the interior junction box (see Figure 8).

2.Remove the electrical knockout and install the strain relief (provided).

3.Hard wire the unit to a 110V 60 Hz or 230V 50 Hz (as appro- priate) 15-amp power source.

4.Replace interior outlet in a horizontal position as noted on the stickers found on the outlet cover plate.

Terminate Power Leads

Electrical Junction Box

Inside Smartlift

Figure 8. Disconnect and Terminate

Power Cord Leads

10

Page 11
Image 11
Chief Manufacturing SL-236 installation instructions Connect Power To The Lift, Non Plenum Rated Installation