Chief Manufacturing SL-236 installation instructions Pretest The Lift Before Installing

Models: SL-236

1 24
Download 24 pages 5.39 Kb
Page 7
Image 7
PRETEST THE LIFT BEFORE INSTALLING

Instruction Manual

SMART-LIFT 236 Electric Ceiling Lifts

 

 

PRETEST THE LIFT BEFORE INSTALLING

IMPORTANT: Before mounting the lift in the ceiling, perform the following test to be sure that it operates properly and has not been damaged during shipping.

1.Attach supports (not supplied) to the top of the lift (see Figure 1).

2.Suspend the lift at least 3 1/2 feet high from a suitable structure [i.e. saw horses, ladders, or tables (see Figure 2)].

NOTE: The supplied momentary push button and power cord can be used to pre-test the lift (see and “OUTSIDE TERMINAL WIRING EXAMPLES” on page 13).

3.Cycle the lift through the “show” and “service” positions, mak- ing sure the unit operates smoothly.

Figure 1. Support the Unit

Figure 2. Suspend the Unit

6

Page 7
Image 7
Chief Manufacturing SL-236 Pretest The Lift Before Installing, Support the Unit . Suspend the Unit