1-21
Cisco Catalyst Blade Switch 3030 Getting Started Guide
78-17052-01
Cisco Catalyst Blade Switch 3030 Getting Started Guide
Installation Warning Statements
Step 2 Insert an appropriate cable into the SFP module port. Insert the other cable end
into the other device (see Figure 9).
Figure 9 Inserting the Cable into the SFP Module Port
For a list of supported modules, see the release notes on Cisco.com. For detailed
instructions on installing, removing, and connecting to SFP modules, see the
documentation that came with the SFP module.
Caution Removing and installing an SFP module can shorten its useful life. Do not remove
and insert SFP modules more often than is absolutely necessary.
Verify Port Connectivity
After you connect to the switch port, the port LED turns amber while the switch
establishes a link. This process takes about 30 seconds, and then the LED turns
green when the switch and the target device have an established link. If the LED
is off, the target device might not be turned on, there might be a cable problem, or
there might be a problem with the adapter installed in the target device. See the
“In Case of Difficulty” section on page 1-22 for information about online
assistance.
143477
11x 12x 13x 14x 15x 16x
Console
11x 12x
13x 14x 15x 16x
CON