3-10
1-3
3-7
3-13

network, setting up 2-10

 

 

precautions for rack-mounting

2-9

preparing for

 

 

 

LAN options, precautions for

2-10

modems, precautions for

2-10

telecommunications, precautions for 2-10

required tools and equipment

2-10

site preparation

2-6

 

 

site requirements

2-6

 

 

tabletop 3-5

 

 

 

tools and equipment required

2-10

two-post rack bracket instructions 3-3

unpacking and inspecting

3-2

 

workbench 3-5

 

 

 

L

LAN

options, precautions for 2-10

precautions 2-10LED indicators

compact flash 3-13

monitoring AVS 3120 operating status 3-13

power 3-13status 3-13

line conditioners, using 5-5

Index

P

port connectors 1-3power

AC power receptacle connecting to system power indicator LED

power source interruptions, preventing damage 5-4

power protection devices

5-5

power source interruptions

5-4

power supplies, using uninterruptible 5-5

power supply guidelines

2-8

R

rack mounting

 

precautions

2-9

two-post rack bracket 3-3

radio frequency interference. See RFI

rear panel

 

connections

1-3

features 1-3

removing an AVS 3120 from a network 3-14

RFI, preventing effects of 5-3

 

RJ-45 cable pinouts 1-5

 

RJ-45 to DB2-5 cable pinouts

1-7

RJ-45 to DB-9 cable pinouts

1-7

M

S

modem

precautions 2-10

N

network, physically removing an AVS 3120 3-14network configuration

safety

 

creating a safe environment

2-8

electrostatic discharge 2-5

 

general precautions 2-4

 

important safety instructions

2-2

installation 2-1

 

precautions with electricity

2-4

preventing EMI 2-6

 

safe environment, creating

2-8

Cisco AVS 3120 Application Velocity System Hardware Installation Guide

 

OL-11805-01

IN-3

 

Page 69
Image 69
Cisco Systems 3120 manual IN-3