Cisco Systems 6509-NEB, OSR-7609 manual Installing the 3000 W AC-Input Power Supply

Models: OSR-7609 6509-NEB

1 28
Download 28 pages 36.02 Kb
Page 12
Image 12
Installing the 3000 W AC-Input Power Supply

Replacing the Power Supply

Installing the 3000 W AC-Input Power Supply

Caution Use both hands to install and remove power supplies. Each Catalyst 6500 series AC-input power supply weighs between 22 pounds (9.9 kg) and 28 pounds (12.6 kg).

To install the 3000 W AC-input power supply, follow these steps:

Step 1 Ensure that the system (earth) ground connection has been made. For ground connection instructions, refer to the installation guide for your hardware platform.

Step 2 Verify that the power switch is in the Off (0) position on the power supply you are installing. (See Figure 7.)

Figure 7 3000 Watt AC-Input Power Supply Front Panel

AC power

connection

Cable

etention

 

 

 

 

 

 

 

 

device

 

 

 

 

 

 

 

 

 

 

110-120V - 15A

 

 

 

 

 

200-240V - 15A

 

 

 

 

 

60/50HZ

 

 

 

 

 

T

 

L

I

 

 

 

 

 

 

L

 

 

 

 

 

S

A

N

 

 

 

 

 

 

 

 

 

 

 

N

 

 

U

 

 

 

Power

I

 

 

R

 

 

 

O

 

 

 

 

 

 

 

switch

 

 

 

 

 

 

 

 

 

 

 

 

INPUT FAN

OUTPUT

 

 

 

 

 

 

OK

OK

FAIL

OUTPUT 42V /17A

42V

/17A

OK

105069

External power

Captive installation Status LEDs (3) connector cover screw

Step 3 Grasp the power supply handle with one hand. Place your other hand underneath the power supply, as shown in Figure 8. Slide the power supply into the power supply bay. Make sure that the power supply is fully seated in the bay.

Catalyst 6509-NEB Switch and Cisco OSR-7609 Router Upgrade Note

12

78-16162-02

 

 

Page 12
Image 12
Cisco Systems 6509-NEB, OSR-7609 Installing the 3000 W AC-Input Power Supply, 3000 Watt AC-Input Power Supply Front Panel