Task No.

Appendix D Site Planning and Maintenance Records

Site Preparation Checklist

Se n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a ck - d o c @ c i s c o . c o m

Table D-1

 

Site Planning Checklist

 

 

 

 

 

 

 

 

Task No.

Planning Activity

Verified By

Time

Date

 

 

 

 

 

1

Space evaluation:

 

 

 

 

Space and layout

 

 

 

 

Floor covering

 

 

 

 

Impact and vibration

 

 

 

 

Lighting

 

 

 

 

Maintenance access

 

 

 

 

 

 

 

 

2

Environmental evaluation:

 

 

 

 

Ambient temperature

 

 

 

 

Humidity

 

 

 

 

Altitude

 

 

 

 

Atmospheric contamination

 

 

 

 

Air flow

 

 

 

 

 

 

 

 

3

Power evaluation:

 

 

 

 

Input power type

 

 

 

 

Power receptacles1

 

 

 

 

Receptacle proximity to the

 

 

 

 

 

equipment

 

 

 

 

Dedicated circuit for power supply

 

 

 

 

Dedicated (separate) circuits for

 

 

 

 

 

redundant power supplies

 

 

 

 

UPS2 for power failures

 

 

 

4

Grounding evaluation:

 

 

 

 

Circuit breaker size

 

 

 

 

CO ground (AC- powered systems)

 

 

 

 

 

 

 

 

5

Cable and interface equipment

 

 

 

 

evaluation:

 

 

 

 

Cable type

 

 

 

 

Connector type

 

 

 

 

Cable distance limitations

 

 

 

 

Interface equipment (transceivers)

 

 

 

 

 

 

 

 

6

EMI3 evaluation:

 

 

 

 

Distance limitations for signaling

 

 

 

 

Site wiring

 

 

 

 

RFI4 levels

 

 

 

1.Verify that the power supply installed in the chassis has a dedicated AC source circuit.

2.UPS = uninterruptible power supply.

Cisco MDS 9200 Series Hardware Installation Guide

 