Figure 2-19 Clearing the EMI Gasket

Chapter 2 Installing the Cisco MDS 9200 Series

Removing and Installing Components

Se n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a ck - d o c @ c i s c o . c o m

Figure 2-19 Clearing the EMI Gasket

1Removing a Caching Services Module

2

STATUS

Amount of gap between the

1mm module EMI gasket and the module above it

Press down

1

2

3

Press down

M

 

DS

9216i

 

4

5

6

7

8

9

10 2-31Manual background 11 Manual backgroundManual backgroundManual backgroundManual background 12 Manual backgroundManual backgroundManual backgroundManual background 13

14

LI

GE1

 

NK

LI

GE2

NK

122001

Removing a Caching Services Module

Note A minimum of two CSMs in each fabric are required for redundancy and data backup.

Warning Do not touch or bridge the metal contacts on the battery. Unintentional discharge of the batteries can cause serious burns. Statement 341

Warning Ultimate disposal of this product should be handled according to all national laws and regulations.

Statement 1040

Caution Wait for all LEDs to turn off before removing the module from the chassis. If the LEDs are on, the module still has power.

 

 

Cisco MDS 9200 Series Hardware Installation Guide

 

 

 

 

 

 

OL-17468-02

 

 

2-31

 

 

 

 

 

Page 87
Image 87
Cisco Systems MDS 9200 Series manual Removing a Caching Services Module, 2-31, 19 Clearing the EMI Gasket