Setting Up and Installing the GbE Interconnect Switch

Always install the interconnect modules in the top-left and top-right bays on the rear side of the server blade enclosure.

Be sure that each interconnect module is fully seated. The latch/handle drops into place when the module is firmly seated.

Always install the GbE Interconnect Switches into the communication bays, which are the left-most (side A) and right-most (side B) bays on the front side of the server blade enclosure.

Installing a New GbE Interconnect Switch for a New Deployment

1.Insert the interconnect modules into the top-left and top-right module bays on the rear side of the ProLiant BL p-Class server blade enclosure.

Figure 2-1: Installing the QuadT or DualTSX

Interconnect Modules

2-2

Compaq ProLiant BL p-Class GbE Interconnect Switch User Guide