Items

Precautions

 

 

4.Refrigerant charging.

4) Refrigerant Charging

 

 

 

Charge refrigerant while operating a compressor as shown above.

 

5) Pinch a charging pipe with a pinch-off plier after completion of charging.

 

6) Braze the end of a pinched charging pipe with copper brazer and take

 

a gas leakage test on the welded parts.

 

 

 

Compressor

Evaporator

 

 

 

 

 

 

Hot Pipe

 

 

Bombe

 

 

 

Condenser

Dryer

 

 

5. Gas-leakage test

* Take a leakage test on the welded or suspicious area with an

electronic leakage tester.

 

 

 

 

 

6. Pipe arrangement

* Check each pipe is placed in its original place before closing

 

in each cycle

a cover back-M/C after completion of work.

 

 

10-4. Standard Regulations for Heavy Repair

1)Observe the safety precautions for gas handling.

2)Use JIG (or wet towel) in order to prevent electric wires from burning during welding. (In order to prevent insulation break and accident.)

3)The inner case shall be melted and insulation material (polyurethane) shall be burnt if not cared during welding inner case parts.

4)The copper pipe shall be oxidized by overheating if not cared during welding.

5)Not allow the aluminum pipes to contact to copper pipes. (In order to prevent corrosion.)

6)Make sure that the inner diameter should not be distorted while cutting a capillary tube.

7)Be sure that a suction pipe and a filling tube should not be substituted each other during welding. ( High efficiency pump.)

76

Page 77
Image 77
Daewoo frs20 manual Take a leakage test on the welded or suspicious area with an, Electronic leakage tester