48 Configuring the PowerConnect 3324/3348 Switch
www.dell.com | support.dell.com
STAND ALONE
The BCM5625_A1 0 initiate successfully
The BCM5625_A1 1 initiate successfully
02-Jan-2000 01:01:11%SSHD-W-NOHOSTKEY: SSHG_init: The SSH daemon
cannot listen
for incoming connections, because a host key has not been
generated.
The service will start automatically when a host key is generated.
01-Jan-2000 01:01:11 %INIT-I-InitCompleted: Initialization task is
completed
console> 01-Jan-2000 01:01:12 %PS-I-PSUP: Power Supply #1 is up
01-Jan-2000 01:01:12%PS-W-PSDOWN: Power Supply #2 is down
01-Jan-2000 01:01:12%LINK-W-Up: 1/e1
01-Jan-2000 01:01:12%LINK-W-UP: 1/e2
01-Jan-2000 01:01:12%LINK-W-Up: 1/e3
01-Jan-2000 01:01:12%LINK-W-UP: 1/e4
01-Jan-2000 01:01:12%LINK-W-Up: 1/e5
01-Jan-2000 01:01:13%LINK-W-Up: 1/e9

After the device has been booted successfully, the system prompt appears (console>) and

the configuration process can be started. The local terminal can be used for configuration.

Device Configuration Introduction

There are two types or levels of configuration. The initial configuration describes basic

configuration functions with basic security considerations. The advanced configuration

includes dynamic IP configuration and more advanced security considerations.

NOTICE: After making any configuration changes, the new configuration must be saved before
rebooting. To save the configuration, enter:
console> enable
console# copy running-config startup-config