Venting Installation

instructions

 

Continued

Number

Description

VKR-58

Roof Vent Kit, Galvanized

 

(Includes: 45° Elbow, 7"-12"

 

Adjustable Pipe, Flue Restrictor,

 

Vertical High Wind Termination,

 

2' Pipe, 4' Pipe, Wall Firestop,

 

Storm Collar, Roof Flashing

 

[0/12 - 6/12], 26 Screws)

VKC-58

Corner Vent Kit, Galvanized

 

(Includes 45° Elbow, 7"-12"

 

Adjustable Pipe, Wall Firestop,

 

Horizontal Termination, 6" Pipe,

 

90° Elbow, 18 Screws)

HHTK-58

High Wind Round Horizontal

 

Termination Kit (Includes Round

 

Termination, Wall Firestop,

 

45° Elbow)

HHT-58

High Wind Round Termination Kit,

 

Galvanized

HTK-58

Horizontal Round Termination Kit

 

(Includes Round Termination,

 

Wall Firestop, 45° Elbow)

HT-58

Horizontal Round Termination,

 

Galvanized

HTS-58

Horizontal Square Termination,

 

Galvanized

HTKS-58

Horizontal Square Termination Kit

 

(Includes: Square Termination,

 

Wall Firestop, 45° Elbow)

HTS-58

Horizontal Square Termination,

 

Galvanized

VT-58

Vertical Round Termination,

 

Galvanized

ST-58-14

14" Snorkel Termination,

 

Galvanized

ST-58-36

36" Snorkel Termination,

 

Galvanized

SC-58

Storm Collar, Galvanized

WF-58

Wall Firestop, Galvanized

RF-58-6

Roof Flashing - 0 to 6/12 Pitch,

 

Galvanized

RF-58-12

Roof Flashing - 6/12 to 12/12

 

Pitch, Galvanized

VR-58

Vertical Restrictor, Galvanized

S-58

Vinyl Siding Standoff,

 

Galvanized

WS-58

Wall Strap

CS-58

Cathedral Ceiling Support

FP-58

Firestop Plate

SF-58

Stucco Flashing - For use

 

with HTS-58

RF-58

Flat Roof Flashing

Fireplace

Installation

CHECK GAS TYPE

Use proper gas type for the fireplace unit you are installing. If your gas supply is not correct, do not install fireplace. See retailer where you purchased the fireplace for proper fireplace according to your gas type or to purchase gas conversion kit (see Ac- cessories, page 37).

Installing optional blower accessory

NOTICE: If installing blower in an existing fireplace with gas connections, shut off gas sup- ply and disconnect heater from gas supply. Contact a qualified service person to do this.

WARNING: If there is a duplex electrical outlet installed in the right side of the bottom of the fireplace base area, be sure that theelectricalpowertotheoutletis turned off before proceeding with blower installation. Failure to do this may result in serious injury.

Model BK Installation

Follow all instructions provided in the blower accessory kit.

1.Attach the power cord to the blower motor by firmly pushing the two female terminals at the end of the power cord onto the two spade terminals on the blower motor (see Figure 26).

2.Attach green ground wire from power cord to blower housing using screw provided (see Figure 26). Tighten screws securely.

Side View

Blower

Lower Firebox

Location

Magnetic

Cavity

Strips

Spade

 

Terminals

 

Green

Ground

Wire

Screw Exhaust

Port

Figure 26 - Blower Model BK

116646-01D

www.desatech.com

17

Page 17
Image 17
Desa T32p-a SERIES Fireplace Installation, Check GAS Type, Installing optional blower accessory, Model BK Installation