3.Place the blower against the lower rear wall of the firebox outer wrapper with the exhaust port directed upward and the thermodisc positioned up near the fireplace bottom. The thermodisc must be oriented near the fireplace bottom as shown in Figure 29, in order to sense tempera- ture and properly operate. The blower will be held in position against the back wall by the magnets incorporated onto the blower housing (see Figure 29).

4.Be certain that all wire terminals are securely at- tached to terminals on blower motor and thermal switch and that the screw for the thermodisc bracket and green ground wire is tight.

5.Mount the speed control box against the mounting plate provided in the lower fire- place cavity by placing the plastic control shaft forward through the round hole (see Figure 27, page 18).

6.While supporting speed control, secure control shaft with lock nut by pushing and turning lock nut with pliers clockwise until it is tight against mounting plate. Place control knob provided on shaft (see Figure 27, page 18).

7.Check to make sure that the power cord is com- pletely clear of the blower wheel and that there are no other foreign objects in blower wheel. Also double check all wire leads and make sure wire routing is not pinched or in a precarious position. Correct accordingly.

8.Turn on power to duplex outlet if previously turned off per the warning in column 2, page 17.

9.Plug in blower power cord to duplex outlet.

10.The blower will only run when the speed control knob is in the ON position and the thermal switch senses temperature after the fireplace begins to heat up. The blower speed can be adjusted by rotating the control knob. To turn off, turn knob fully counterclockwise until it clicks off. If the blower is ON and has been running with the fireplace operating, the blower will continue to run for a short time after the fireplace has been turned off. As the thermal switch cools down, the blower shuts down automatically.

11.Peel off the backing paper and stick the sup- plied wiring diagram decal on the firebox bot- tom approximately 12" in front of the blower (see Figure 28, page 18).

Power Cord

White

Blue

 

Wire

Wire

Black

 

 

Magnetic

Wire

 

 

Strips

Thermal

 

 

Air Flow

Switch

 

 

Direction

 

 

Thermal

Phillips

Ring

Switch

Bracket

Screw

Terminal on

 

 

Green Wire

Route BKT Blower

Air Flow

Through This Area

Direction

Thermodisc

Side View Firebox Bottom

Blower Magnets

Location

Figure 29 - Blower Model BKT

Blower Wiring Diagram

CAUTION: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dan- gerous operation. Verify proper operation after servicing.

 

 

 

Variable

Fan Switch

 

 

Fan Switch

 

 

 

 

(N.O.)

 

 

Off

1

Black

 

 

 

2

110/115

On

 

Blue

 

 

 

V.A.C. Black

 

Blower

 

 

 

 

 

 

White

 

Motor

Green

Figure 30 - Blower Wiring Diagram for

Thermostat-Controlled Models

116646-01D

www.desatech.com

19

Page 19
Image 19
Desa T32N-a SERIES, CGDV32pR, T32p-a SERIES Plug in blower power cord to duplex outlet, Blower Wiring Diagram