INSTALLATION
Continued
6.Swing junction box with harness to left side while pulling sufficient length of har- ness out through control panel cover to reach mounting location on left side.
7.Reinsert retaining flange through slot and swing screw mounting tab back through notch as before.
8.Slide junction box down until mounting holes line up and replace inner retaining cover.
9.Pull end of 3 wire Romex supply line through universal strain relief bushing in remaining cover.
10.Strip back outer Romex to about 4” and connect black, white and green wires ac- cordingly using approved connectors.
Junction Box
Screws and
Outer
Cover
Slot Retaining
Notch Flange
Mounting
Tab
Junction Box
11.Tuck tailing wires into junction box and replace cover using 2 remaining screws.
12.Tighten down strain adjustment on uni- versal bushing until Romex sheathing is secured.
IMPORTANT: Inspect components and wir- ing for damage before connecting power to unit. If any components are found damaged, contact an authorized dealer for original DESA Heating Products replacement part(s) or call DESA Heating Products at
IMPORTANT: Prior to operation remove foam shipping brace located under motor mount (see Figure 8).
Motor
Mount
Foam
Shipping
Brace
Figure 8 - Removing Shipping Brace
Screws and
Outer Cover from Other Side
Cover with
Universal
Strain Relief
Figure 7 - Relocating Junction Box to
Left
www.desatech.com111076-01F