Desa E32L, E36L Installation, Continued, Removing Shipping Brace, Relocating Junction Box to Left

Models: E32LB E36L E36LH E32L E32LH E36LB E36LBH E32LBH

1 28
Download 28 pages 45.27 Kb
Page 6
Image 6
Figure 8 - Removing Shipping Brace

INSTALLATION

Continued

6.Swing junction box with harness to left side while pulling sufficient length of har- ness out through control panel cover to reach mounting location on left side.

7.Reinsert retaining flange through slot and swing screw mounting tab back through notch as before.

8.Slide junction box down until mounting holes line up and replace inner retaining cover.

9.Pull end of 3 wire Romex supply line through universal strain relief bushing in remaining cover.

10.Strip back outer Romex to about 4” and connect black, white and green wires ac- cordingly using approved connectors.

Junction Box

Screws Figure 7 - Relocating Junction Box to and

Outer

Cover

Slot Retaining

Notch Manual background Flange

Mounting

Manual backgroundTab

Junction Box

11.Tuck tailing wires into junction box and replace cover using 2 remaining screws.

12.Tighten down strain adjustment on uni- versal bushing until Romex sheathing is secured.

IMPORTANT: Inspect components and wir- ing for damage before connecting power to unit. If any components are found damaged, contact an authorized dealer for original DESA Heating Products replacement part(s) or call DESA Heating Products at 1-866-872-6040 for referral.

IMPORTANT: Prior to operation remove foam shipping brace located under motor mount (see Figure 8).

Motor

Manual backgroundMount

Foam

Shipping

Brace

Figure 8 - Removing Shipping Brace

Screws and

Outer Cover from Other Side

Cover with

Universal

Strain Relief

Figure 7 - Relocating Junction Box to

Left

www.desatech.com111076-01F

Page 6
Image 6
Desa E36LH, E36LBH, E32LH, E32LBH Installation, Continued, Removing Shipping Brace, Relocating Junction Box to Left