MDVFST DIRECT-VENT GAS FIREPLACE

PRE-INSTALLATION PREPARATION

Continued

MANTEL CLEARANCES

Woodwork, such as wood trims, mantels, and other combustible materials projecting no more than 1 1/2 inches (3.8cm) shall not be placed within 7 inches (17.8cm) from the opening of the unit. Combustible material above and projecting more than 1 1/2 inches (3.8cm) from the appliance’s face must not

"

 

 

5/8

 

 

(600mm)

 

 

39 3/4"

23

 

 

(1010mm)

Min.

43 (1098mm)/4"

Vertical Height

Depends on

Installation

90o MANTEL CLEARANCES Elbow

45o

Elbow

263/8"

(670mm)

Refer to Pages 9 through 12 for Horizontal and Vertical Installation Details

be placed less than 15 inches (38.1cm) from the louver opening (see Figure 5).

Figure 6 - Rough Opening for Installing See Thru Fireplace

GENERAL VENTING Horizontal UNIT

Length Depends

on Installation

Combustible

Drywall (Gypsum

Board, Sheetrock, Etc.)

Material May

 

 

Be Used

 

 

Safe Zone for

 

12"

 

 

 

Projection of

 

(305mm)

Combustible

 

Min.

 

 

 

 

Material

21"

4"

 

2 x 4

(533mm)

 

Spacer

Min.

(102mm)

 

15"

Min.

 

 

 

 

 

(381mm)

 

1 1/2" (38mm)

Min.

 

Min.

2" (51mm)

Dia. Hole

(51mm)2"

1" (25mm)

Dia. Hole

(25mm)1"

3"

(76mm)

FRAMING 3" (76mm)

Figure 9 - Vent Opening Height

GENERAL VENTING

Note: Terminations are not designed for installation prior to transportation.

These models are approved for use with both flex and rigid Vanguard vent components as well as Simpson Dura-Vent 6 5/8" direct-vent pipe components and terminations.

Your fireplace is approved to be vented either through the side wall, or vertically using the

7" (178mm)

 

Min.

UNIT

 

Top of Louver

 

Opening

 

Figure 5 - Mantel Clearances

FRAMING

Once the final location has been determined, observing height clearances for vent termi- nation, you may construct framing using dimensions shown in Figure 6, depending on your installation.

If the appliance is to be installed directly on carpeting, tile (other than ceramic), or any combustible material other than wood floor- ing, the appliance must be installed on a metal or wood panel extending the full width and depth of the appliance. There are three holes on each side of the bottom of the unit where screws can be used to secure the unit to the floor.

Figure 7 - Hole Locations For Gas Line and Electric Wires

10" Manual background

(254mm) Square Min. Manual background

Height

Depends On

Installation

Figure 8 - Rough Opening for Installing Exterior Vent Terminal

following guidelines:

Only use Vanguard or Simpson Dura- Vent GS venting components or kits spe- cifically approved for this fireplace.

Minimum clearance between vent pipes and combustible materials is 1" (25 mm), except where stated otherwise.

Combustible material may be flush with the top front of fireplace with a maxi- mum thickness of 3/4".

Do not recess venting terminals into a wall or siding.

Install horizontal venting with a 1/4" rise for every 12" of run toward the termination.

You may paint the vent terminal with 450°F (232°C) heat-resistant paint to co- ordinate with the exterior finish.

There must not be any obstruction such as bushes, garden sheds, fences, decks, or utility buildings within 24" from the front of the termination cap.

Do not locate termination cap where exces- sive snow or ice build up may occur. Be sure to clear vent termination area after snow falls to prevent accidental blockage of venting system. When using snow blowers, do not direct snow towards vent termination area.