MDVFST
Continued
MANTEL CLEARANCES
Woodwork, such as wood trims, mantels, and other combustible materials projecting no more than 1 1/2 inches (3.8cm) shall not be placed within 7 inches (17.8cm) from the opening of the unit. Combustible material above and projecting more than 1 1/2 inches (3.8cm) from the appliance’s face must not
" |
|
|
5/8 |
|
|
(600mm) |
|
|
39 3/4" | ||
23 |
|
|
(1010mm)
Min.
43 (1098mm)/4"
Vertical Height
Depends on
Installation
90o Elbow
45o
Elbow
263/8"
(670mm)
Refer to Pages 9 through 12 for Horizontal and Vertical Installation Details
be placed less than 15 inches (38.1cm) from the louver opening (see Figure 5).
Figure 6 - Rough Opening for Installing See Thru Fireplace
Horizontal
Length Depends
on Installation
Combustible | Drywall (Gypsum | |||
Board, Sheetrock, Etc.) | ||||
Material May | ||||
|
| |||
Be Used |
|
| Safe Zone for | |
| 12" |
| ||
|
| Projection of | ||
| (305mm) | Combustible | ||
| Min. |
| ||
|
|
| Material | |
21" | 4" |
| 2 x 4 | |
(533mm) |
| Spacer | ||
Min. | (102mm) |
| ||
15" | Min. |
|
| |
|
|
| ||
(381mm) |
| 1 1/2" (38mm) | ||
Min. |
| Min. |
2" (51mm)
Dia. Hole
(51mm)2"
1" (25mm)
Dia. Hole
(25mm)1"
3"
(76mm)
3" (76mm)
Figure 9 - Vent Opening Height
GENERAL VENTING
Note: Terminations are not designed for installation prior to transportation.
These models are approved for use with both flex and rigid Vanguard vent components as well as Simpson
Your fireplace is approved to be vented either through the side wall, or vertically using the
7" (178mm) |
|
Min. | UNIT |
| |
Top of Louver |
|
Opening |
|
Figure 5 - Mantel Clearances
FRAMING
Once the final location has been determined, observing height clearances for vent termi- nation, you may construct framing using dimensions shown in Figure 6, depending on your installation.
If the appliance is to be installed directly on carpeting, tile (other than ceramic), or any combustible material other than wood floor- ing, the appliance must be installed on a metal or wood panel extending the full width and depth of the appliance. There are three holes on each side of the bottom of the unit where screws can be used to secure the unit to the floor.
Figure 7 - Hole Locations For Gas Line and Electric Wires
10"
(254mm) Square Min.
Height
Depends On
Installation
Figure 8 - Rough Opening for Installing Exterior Vent Terminal
following guidelines:
•Only use Vanguard or Simpson Dura- Vent GS venting components or kits spe- cifically approved for this fireplace.
•Minimum clearance between vent pipes and combustible materials is 1" (25 mm), except where stated otherwise.
•Combustible material may be flush with the top front of fireplace with a maxi- mum thickness of 3/4".
•Do not recess venting terminals into a wall or siding.
•Install horizontal venting with a 1/4" rise for every 12" of run toward the termination.
•You may paint the vent terminal with 450°F (232°C)
•There must not be any obstruction such as bushes, garden sheds, fences, decks, or utility buildings within 24" from the front of the termination cap.
•Do not locate termination cap where exces- sive snow or ice build up may occur. Be sure to clear vent termination area after snow falls to prevent accidental blockage of venting system. When using snow blowers, do not direct snow towards vent termination area.
4 | 106442 |