OWNER’S MANUAL
VENTING INSTALLATION
Continued
INSTALLATION FOR HORIZONTAL TERMINATION
1.Determine the route your horizontal venting will take. Note: The location of the horizontal vent termination on the exterior wall must meet all local and national building codes and must not be easily blocked or obstructed.
WARNING: Do not recess vent terminal into a wall or siding.
Snorkel terminations are available for terminations requiring a vertical rise on the exterior of the building (see Figures 11 and 12). Snorkel kit SVK is also available (see page 13). Follow the same installation procedures used for standard horizontal terminations. If in- stalling the snorkel termination below grade (basement applications), you must provide proper drainage to prevent wa- ter from entering the snorkel termina- tion (see Figure 12). Do not back fill around the snorkel termination.
2.Rigid vent pipes and fittings have spe- cial
Flexible vent pipe must be installed with spacer springs every 12". See Figure 13, page 8. All connections must be clamped tightly and sealed with high temperature silicone sealant as specified in the sec- ond warning statement on page 6.
12" Minimum |
90° |
1' Minimum |
Snorkel |
45° |
Figure 11 - Snorkel Termination
90° | Snorkel | |
| 12" Minimum | |
1' Minimum | Adequate | |
Drainage | ||
|
45°
Figure 12 - Snorkel Termination with Drainage Pipe
Continued106442 | 7 |