Pre-Installation Preparation
21" (53.3 cm) To Center of
28 5/8" Top Vent
(72.7 cm)
Continued
|
|
|
| These dimensions allow for 1" | ||||
14 3/4" |
|
| clearance at sides and back of | |||||
(37.5 cm) |
|
| fireplace. | |||||
|
|
|
| |||||
|
|
|
| However, 0" clearance is also | ||||
|
|
|
| permitted at all sides when framed. | ||||
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
| 14 3/4" (37.5 cm) | ||||
|
|
|
|
|
| to Nailing | ||
|
|
|
|
|
| Flanges | ||
|
|
|
|
|
|
|
|
|
56 3/4"
12 1/4" (31 cm)
to Opening
(144 cm)
Figure 6 - Framing Clearances for Corner Installation
MANTEL CLEARANCES
Figure 8, page 8, shows projected mantel depths at various heights above top of louver opening. Figure 7 shows minimum allowable distances from various mantel components in relation to both sides of fireplace opening.
WARNING: When finishing appliance do not overlap com- bustible materials onto the black front face. Brick, tile or other noncombustiblematerialsmaybe applied to the face provided that any fireplace openings are not blocked and gaps in the material used and the face are sealed with a noncombustible caulking.
14 3/4" (37.5 cm)
to Nailing Flanges
7 7/8" (20 cm) to
Center of 4"
57/8"
(15 cm) to
Nailing
Flange
353/4"
(90.8 cm)
|
|
|
|
Inlet |
| 36 1/4" (92.1 cm) to Nailing Flange | |
Electrical |
|
|
|
cm) |
38"
(96.5 cm) 2" (5.1 cm)
1 1/4" | 5/8" |
(3.2 cm) | (16 mm) |
(91.4 cm) Dimensions |
|
36" Face |
|
cm)
Wall Switch
Wireway
8" (20.3 cm) Gas Supply
Inlet
(11.4 cm) | 36 3/4" (93.4 | |||
/2" |
|
|
| |
4 1 |
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
36 1/4" (92.1 cm)
Face Dimensions
37" (94 cm)
to Nailing Flange
1 1/2" (3.8 cm)
2 1/2" (6.4 cm)
Wall Switch
Wireway
111/8"
(28.3 cm) Air Kit Location
15 3/8"
(39 cm)
6" (15.2