2
7
Aftercompletionof the mains connection the built--inor
--underovenislocated inthe cupboard and aligned.
The screwsand plastic sleeves supplied in a bag are
tobeinsertedatthe rightand left side of the oven frame
andthe applianceisto bescrewed downinthe cupbo-
ard.
Priortofirstuseremove anypossiblyexisting
labelsand protectivefoilsfromthe frontof the
appliance.
Afterconnectiontothe powersupplyall heating
elementsaretobeswitched on shortlyatmaxi-
mumsettingone afteranother,in ordertocheck
the operability.