Section 2: Mechanical installation

Daniel 3818 LNG Liquid Ultrasonic Meter Installation Manual

May 2012

3-9000-771 Rev A

 

 

Figure 2-9 Incorrect sling attachment

8.NEVER apply shock loads to the meter. Always lift the meter gradually. If shock loading ever occurs, the slings must be inspected per manufacturer's procedures prior to being placed in any further service.

30

Appropriately rated lifting slings