Installation and Configuration
b.Pull the operation and display panel gently, rotate it 90 degrees clockwise and snap it back into position, as shown in Figure 8.
Figure 8 Rotate the operation and display panel
Operation and Display
Panel Rotated
Clockwise 90 Degrees
c.Pull the logo on the front plastic bezel cover gently, rotate it 90 degrees clockwise and snap it back into position. The rotated front plastic bezel cover is shown in Figure 8.
d.Replace the front plastic bezel cover on the Liebert GXT3. At this point, the UPS operation and display panel and logo have been rotated 90 degrees clockwise, which provides upright viewing for users.
5.Place the Liebert GXT3 and any battery cabinets on the support bases. Each Liebert GXT3 needs two support assemblies, as shown in the lower half of Figure 1.
5.1.2Rack-Mount UPS Installation
When using the Liebert GXT3 in a
When using the optional Adjustable Rack Mount Kit, you will use the following instructions. The figures accompanying 5.1.3 - Installing the Adjustable
! CAUTION
The GXT3 is heavy; see 12.0 - Specifications. The UPS must be installed as near the bottom of a rack as possible. If placed too high, it can make the rack
5.1.3Installing the Adjustable Rack-Mount Kit—Sold Separately
This kit contains parts needed to mount several different models of UPS and external battery cabinets into
Parts included are:
Item | Quantity |
|
|
Rear bracket members | 2 |
|
|
Front bracket members | 2 |
|
|
Inner bracket members | 2 |
|
|
M4 machine screws | 16 |
|
|
M4 locking hex nuts | 8 |
|
|
M5 machine screws | 8 |
|
|
Tools needed for installation are:
•one Phillips screwdriver
•one 7mm wrench
Liebert® GXT3™ | 12 |