Emerson BP7251 warranty c. Cut terminal off of the yellow lead wire and

Models: BP7251

1 16
Download 16 pages 8.42 Kb
Page 12
Image 12
c. Cut terminal off of the yellow lead wire and

15.Carefully lift the fan and seat the hanger ball/downrod assembly on the hanger bracket that was just attached to the outlet box (Figure 9B). Be sure the groove in the ball is lined up with the tab on the hanger bracket (Figure 8B).

!WARNING

Failure to seat tab in groove could cause damage to electrical wires and possible shock or fire hazard.

NOTE: CEILING COVER,

 

SUPPLY WIRES AND

OUTLET

FAN WIRES OMITTED

BOX

FOR CLARITY.

 

d.Securely connect the blue wire and yellow wire from the downrod to the supply red (hot) wire using wire connector (supplied). After connections have been made, turn leads upward and carefully push leads into the outlet box, with the white and green leads on one side of the outlet box and the black, blue and yellow leads on the other side of the outlet box.

!WARNING

Check to see that all connections are tight, including ground, and that no bare wire is visible at the wire connectors, except for the ground wire. Do not operate fan until blades are in place. Noise and fan damage could result.

 

HANGER

 

BRACKET

Figure 9B

HANGER BALL/

 

DOWNROD ASSEMBLY

!WARNING

To avoid possible fire or shock, do not pinch wires between the hanger ball/downrod assembly and the hanger bracket.

!WARNING

To avoid possible electrical shock, be sure electricity is turned off at the main fuse box before wiring. NOTE: If you are not sure if the outlet box is grounded, contact a licensed electrician for advice, as it must be grounded for safe operation.

NOTE: If you are installing a SR330 Remote Control or a SW350 Wall Control to operate the fan and light, refer to the installation instructions and wiring diagrams shown in SECTION A or this Owner’s Manual.

16.For a wall control installation you will need a three- wire (with ground) conductor cable between the ceiling and wall outlet boxes. This will allow you to control the fan separately from the lights. Figure 10B is a basic wiring diagram that will control the uplight and downlight on a switch and the fan on a separate control. Refer to the installation instructions and wiring diagrams supplied with the Emerson Fan Control Owner’s Manual.

a.Connect the green grounding lead from the hanger ball and the green grounding lead from the hanger bracket to the grounding conductor of supply (this may be a bare wire or a wire with green colored insulation). Securely connect wires with wire connector (supplied).

b.Securely connect the white wire from the downrod to the supply white (neutral) wire using wire connector (supplied). Securely connect the black wire from the downrod to the supply black (hot) wire using wire connector (supplied).

c. Cut terminal off of the yellow lead wire and

strip insulation 1/2” from end of wire.

12

 

 

 

EMERSON

 

 

 

 

FAN

 

 

 

 

CONTROL

 

LISTED OUTLET BOX

BLACK FAN WIRE

 

 

 

BLACK

 

 

 

RED

 

LIGHT

BLACK

GREEN WIRE

 

BLACK

CONTROL

(GROUND)

GROUND

 

(HOT)

FROM

 

 

TO 120

 

 

 

HANGER

 

 

 

BRACKET

WHITE

RED

 

VOLT

 

WHITE

 

SUPPLY

 

 

 

 

GROUND

WHT.

WIRE

 

YELLOW

GROUND

BLUE

 

GREEN WIRE (GROUND)

FROM HANGER BALL

LISTED WIRE

CONNECTOR (4)

Figure 10B

17.Lift the ceiling cover up to the threaded studs and turn until studs protrude through the holes in the ceiling cover (Figure 11B).

18.Secure the ceiling cover in place by installing two lockwashers and two knurled knobs (supplied) (Figure 11B). Tighten the knurled knobs securely until the ceiling cover fits snugly against the ceiling and the hole in the ceiling cover is clear of the downrod.

!WARNING

To avoid possible fire or shock, make sure that the electrical wires are completely inside the outlet box and not pinched between the ceiling cover and the ceiling.

 

CEILING COVER

1-1/4"

LOCKWASHERS (2)

 

THREADED

 

STUD

 

KNURLED KNOB

 

Figure 11B

19.Use three 10-32 x 3/8” pan head screws and flat washers (supplied) to secure the flange to the blade (ordered separately) (Figure 12B). Repeat for the four remaining blades.

20.Use the 10 round recessed holes in the motor hub marked with “5” and install the five blade assemblies in accordance with Step 21.

Page 12
Image 12
Emerson BP7251 warranty c. Cut terminal off of the yellow lead wire and