Installation
5.Extend the slide rail assembly by sliding the front member forward until it touches the rack’s front vertical rails (adjustable length: 18 to 32 inches
Figure 13 Installing front member of each slide rail assembly
Front |
|
Vertical |
|
Pole | Slide |
Front |
|
Member |
|
M5 Screw |
|
4 pieces | Rear |
| |
| Member |
6.Fasten rear member and front member together using four M4 screws and four M4 nuts (M4 nuts have been
Figure 14 Fastening rear member and front member together
Rear Member |
M4 Screw, 8 pieces |
Front member | M4 Nut, 8 pieces |
7.Fasten inner members pulled from the slide rail assemblies in Step 2 to the UPS on both sides with eight M4 screws provided in this kit. Make sure that the retaining latch is near the rear of the UPS, as shown in Figure 15.
Figure 15 Installing inner members
Liebert GXT3 UPS
Inner Member
Retaining Latch
M4 screw, 8 pieces
8. Use M4 screws to install ears of accessories on both sides of the UPS, as shown in Figure 16.