Instruction Manual
Model NGA2000 HFID
•EPROM test - Checks the EPROM on the Analysis Com- puter PCB.
•RAM test - Checks the RAM on the Analysis Computer PCB.
•Power supply test - Verifies that all internal DC voltages are within the required tolerances.
•Network test - Checks the inter- nal network interface.
•20 bit ADC test - Checks the
•12 bit ADC test - Checks the
•Power Supply PCB test - Checks the presence of the Power Supply PCB by activating the
•Safety PCB test - Checks the presence of the Safety PCB by sending a command and reading it back.
•Case temperature test - Com- pares the temperature read be- tween the Preamp temperature sensor and the case temperature
INTERNAL PRESSURE REGULATOR
Burner Air
Fuel
Sample
sensor. They must be within 10°C of each other. This test sometimes fails if the case is opened. The sensor in the Preamp will take longer to cool off since it is in an enclosure.
•Oven/Sample Temperature test - Compares the temperature read between the sample temperature sensor and the oven temperature sensor. They must be within 50°C of each other.
•The
8.Set the desired oven setpoint in the range of 93°C to 204°C (200°F to 400°F).
9.Wait for the Purge Air green LED to il- luminate.
10.Introduce the remaining supply gases. Perform leak check. (See Section
11.Set and verify the internal gas pres- sures.
TYPICAL OPERATING PRESSURES 965 to 1103
Purge air of the following specifications must be present:
Flow: | 16 to 18 L/min. |
Supply Pressure: 689 to 1378
Rosemount Analytical Inc. A Division of Emerson Process Management |