Empire Comfort Systems 3)(N VERTICAL TERMINATION continued, Installation of Vertical Inlet Baffle

Models: 2 1 DVD32FP3 3)(N

1 60
Download 60 pages 21.3 Kb
Page 35
Image 35
VERTICAL TERMINATION (continued)

VERTICAL TERMINATION (continued)

Installation of Vertical Inlet Baffle

The vertical inlet baffle is to be used only in a completely vertical vent installation. The vertical inlet baffle can be used when the vertical vent rise is between 10 feet and 40 feet. To maintain the yellow flame in the main burner, purchase Vertical Inlet baffle, DVF-139 from your Empire Comfort Systems, Inc. distributor or dealer for Simpson Duravent only.

In a vertical vent rise the rear (yellow) flame on the main burner can be reduced due to the drawing action from the flue exhaust pipe and the air inlet pipe. A decrease in the height or the appearance of the yellow flame may occur when the vertical vent rise is between 10 feet and 40 feet. To enhance the yellow flame on the main burner, the vertical inlet baffle can be attached to the direct vent high wind vertical top.

Please use the following steps to install the vertical inlet baffle.

1.Place the vertical inlet baffle over the exterior of the air inlet openings on the direct vent high wind vertical top.

2.There are three sections of air openings on the exterior of the air inlet pipe.

To achieve the maximum amount of yellow flame the vertical inlet baffle will cover-up three sections of air openings.

To achieve the minimum amount of yellow flame the vertical inlet baffle will cover-up one section of air openings.

3.Attach vertical inlet baffle to the direct vent high wind vertical top with (2) 3/8" hex-head screws provided with vertical inlet baffle.

4.Installation of vertical inlet baffle is completed.

Parts List

Description

Part

Quantity

Number

Supplied

 

Vertical Inlet Baffle

DVF-139

1

3/8" Hex-Head Screw

R-2656

2

Reassembly and Resealing Vent Pipe System

Attach vent pipe to inlet and outlet vent adaptor on fireplace in either the vertical or horizontal position, replace horizontal and vertical pipe lengths, elbows and horizontal or vertical termination kit.

All vent system components lock into place by sliding the concentric pipe section with four (4) equally spaced interior beads onto the appliance collar or previously installed component end with four

(4)equally spaced indented sections. When the internal beads of each starting outer pipe line up, rotate pipe section clockwise 90° (approximately 3 inches). The vent pipe is now locked together.

Continue replacing components per the vent system configuration. Be certain that each succeeding vent component is securely fitted and locked into the preceding component in the vent system.

Reassembly and Resealing Gas Accumulation Relief System Glass Frame Assembly and Combustion Chamber Whenever the glass frame assembly is pivoted open by a delayed ignition in the main burner, the glass frame assembly gaskets and combustion chamber must be examined by a qualified service person for damage. All damaged gaskets on the glass frame assembly and combustion chamber must be replaced by a qualified service person. If damage occurs to the combustion chamber, it must be replaced by a qualified service person. Contact Empire Comfort Systems, Inc. for replacement parts.

Vertical Through the Roof Applications (Figure 53) Your Gas Fireplace has been approved for:

a)Vertical installations up to 40 feet in height.

b)Two sets of 45 degree elbow offsets within these vertical installations. From 0 to a maximum of 8 ft. a vent pipe can be used between elbows.

c)Wall straps must be used to support offset pipe every 4'.

This application will require that you first determine the roof pitch and use the appropriate venting components.

Figure 53

23552-4-0408

Page 35

Page 35
Image 35
Empire Comfort Systems 3)(N, 1, DVD32FP3 VERTICAL TERMINATION continued, Installation of Vertical Inlet Baffle