Empire Comfort Systems DVD42FP5 Installation, Top of Vent 376 mm 125 mm, Framing and Finishing

Models: DVD48FP5 DVD36FP3 DVD42FP5 DVD32FP3-1, DVD36FP3-1, DVD42FP3-1, DVD48FP3-1,DVD32FP5-2, DVD36FP5-2, DVD42FP5-2, DVD48FP5-2 DVD48FP3 DVD42FP3

1 52
Download 52 pages 60.93 Kb
Page 11
Image 11
INSTALLATION

INSTALLATION

Framing and Finishing

1.Choose unit location.

2.Frame in fireplace with a header across the top. It is important to allow for finished face when setting the depth of the frame.

3.Attach fireplace to frame using adjustable frame. Preset depth to suit facing material (adjustable to 1/2", 5/8" or 3/4" depths).

4.Use (8) 1/2" hex-head screws supplied in hardware package, to screw through slotted holes in drywall strip and then screw

into pre-drilled holes on fireplace side. Measure from face of fireplace to face of drywall strip to determine final depth.

Vent Pipe Clearance

Note: Maintain one inch (1") of clearance around vertical vent pipe. See Fig. 9A. For horizontal vent, maintain a minimum 1" clearance to the bottom and sides of the vent, and 3" clearance to combustibles above the vent pipe. See Fig. 9B

Figure 8

VENT PIPE

Top of Vent

3"(76 mm)

1"(25 mm)

Figure 9B

Combustibles NOT allowed in shaded area

4” Diameter flue

Framing and Finishing 7” Diameter intake vent

1" (25 mm)

1" MINIMUM CLEARANCE AROUND VENT PIPE

Figure 9A

23552-1-0607

Page 11

Page 11
Image 11
Empire Comfort Systems DVD32FP3-1, DVD36FP3-1, DVD42FP3-1, DVD48FP3-1,DVD32FP5-2, DVD36FP5-2, DVD42FP5-2, DVD48FP5-2