Connecting AC and PoE Power

3.Observe the power CPU LED (not shown), located on the front panel. During the initialization, the CPU LED will start by illuminating solid amber, then start blinking green, then blinking amber, then blinking green again until the end of the initialization, and then turns solid green.

Note: If the CPU LED illuminates solid red, there was a critical failure. For more information about the LED indications and troubleshooting, refer to Chapter 4. If you need additional help, contact Enterasys Networks. Refer to “Getting Help” on page 1-7 for details.

If the switch is a standalone switch, it will take approximately 30 seconds for the switch to start up. If the switch is a stack Manager, it can take up to 3 minutes or more to start up, depending on the number of Member switches in the stack.

C2RPS-PoE Redundant Power System

If you are installing an optional redundant power system (C2RPS‐POE), refer to the installation instructions supplied with the SecureStack C2RPS‐POE. The switch is connected to a C2RPS‐POE using a C2RPS‐POE Cable.

Figure 3-7 Accessing the RPS connector

MAC

ADDRESS

 

 

 

 

 

 

SERIAL

NO.

 

 

 

 

 

 

Redundant

 

 

DC

 

 

 

Line

12VPower

 

 

 

 

 

 

/13ASupply

 

 

 

MAX.

 

Â

 

Â

Á

À

Á

1 RPS coverplate

3 Screw holes for coverplate

2Retaining screws to fasten plate

SecureStack A2 PoE Installation Guide 3-13

Page 43
Image 43
Enterasys Networks A2H124-24P, A2H124-48P manual C2RPS-PoE Redundant Power System, Accessing the RPS connector