Connecting to the Network
3-20 Hardware Installation
Figure 3-12 Connecting a UTP Cable Segment to RJ45 Port
3. VerifythatalinkexistsbycheckingthattheLink/ActivityLEDisON(solidgreenor
blinkinggreen).
4. IftheLink/ActivityLEDisOFF,performthefollowingstepsuntilitison:
a. VerifythatthecablingbeingusedisCategory5orbetterwithanimpedance
between85and111ohmswithamaximumlengthof100meters(328feet).
b. Verifythatthedeviceattheotherendofthetwistedpairsegmentisonand
properlyconnectedtothesegment.
c. VerifythattheRJ45connectorsonthetwistedpairsegmenthavetheproper
pinoutsandcheckthecableforcontinuity.Typicall y,acrossovercableisused
betweenhubdevicesbutthisisnotnecessary.Astraightthroughcablecanbe
usedtoconnectbetweentheswitchandanydevice.RefertoFigure313and
Figure 314forfourwireRJ45connections.RefertoFigure315andFigure 316
foreightwireRJ45connections.
d. EnsurethatthetwistedpairconnectionmeetsthedBlossandcablespecifications
outlinedintheCablingGuide.RefertoRelatedDocumentsonpagexvifor
informationonobtainingthisdocument.
5. Ifalinkisnotestablished,contactEnterasysN etworks.RefertoGettingHelpon
page17fordetails.
Repeatallstepsaboveuntilallconnectionshavebeenmade.
1RJ45 connector 2Port 8 3Port 8 Link/Activity LED
Note: If the cable is connected to one of the PoE RJ45 front panel ports, solid green or
blinking green also indicates that PoE power is available. If the LED is solid amber or
blinking amber PoE power failed. For more details, refer to Chapter 4.
1
2
11
12
1357911 13 1517192123
2468101214 16 18 20 2224
1234567891011 12
ÀÁÂ