Considerations Prior to Installation
3-2 Hardware Installation
Considerations Prior to InstallationWheninstallingtheswitch,notethefollowing:
•Beforestartingtheinstallationprocedure,notifythenetworkadministratorofthe
installation.
•Followtheinstallationproceduresintheorderaspresentedinthisguide.
•DonotconnecttheswitchtothenetworkuntilyouhaveestablishedthecorrectIP
address.
Required ToolsAPhillipsscrewdriverisrequiredtoinstalltheswitchintoarack.
Unpacking the SwitchUnpacktheswitchasfollows:
Table 3-1 Contents of Switch Carton
Item Quantity
A2H254-16 Switch
Mounting kit (two mounting brackets and eight M3x6-mm screws for rack mounting)
Rubber feet with adhesive backing for installation on a flat surface
AC power cord (The type of power cord is country dependent.)
This installation guide
Customer Release Notes
URL notice card
1. Opentheboxandremovethepackingmaterialprotectingtheswitch.
2. VerifythatthecontentsofthecartoncontainstheitemslistedinTable3‐1.
3. Removethetapesealonthenon‐conductivebagtoremovetheswitch.
4. Performavisualinspectionoftheswitchforanysignsofphysicaldamage.Contact
EnterasysNetworksifthereareanysignsofdamage.Referto“GettingHelp”on
page1‐6fordetails.
1
1
4
1
1
1
1