Rack Mounting the Switch

Guidelines for Rackmount Installation

The installation site must be within reach of the network cabling and meet the requirements listed below:

Appropriate grounded power receptacles must be located within 152 cm (5 ft) of the location.

A temperature of between 0°C (32°F) and 40°C (104°F) must be maintained at the installation site with fluctuations of less than 10°C (18°F) per hour.

If an optional redundant power system is going to be installed and connected to the 14‐pin Redundant Power Supply input connector on the rear of the switch, refer to the installation guide shipped with the redundant power system.

Note: To ensure proper ventilation and prevent overheating, leave a minimum clearance space of 5.1 cm (2.0 in.) at the left, right, and rear of the switch.

Warning: Before rack-mounting the switch, ensure that the rack can support it without compromising stability. Otherwise, personal injury and/or equipment damage may result.

Advertencia: Antes de montar el equipo en el rack, asegurarse que el rack puede soportar su peso sin comprometer su propia estabilidad, de otra forma, daño personal o del equipo puede ocurrir.

Warnhinweis: Überzeugen Sie sich vor dem Einbau des Gerätes in das Rack von dessen Stabilität, ansonsten könnten Personenschäden oder Schäden am Gerät die Folge sein.

Attaching Brackets and Installing in Rack

Proceed as follows to install the switch into a 19‐inch rack:

1.Attach the rackmount brackets to the switch, as shown in Figure 3‐6, using the eight M3x6 mm flathead screws shipped with the switch.

Figure 3-6 Attaching the Rackmount Brackets

1 Rackmount brackets

2 M3x6 mm flathead screws