Post-Installation Checklist

Use the following checklist to verify that the XR Battery Enclosure has been installed correctly:

Ensure that all busbars/cables between the XR Battery Enclosure(s) and the UPS are correctly installed.

Ensure that the DC breaker (if available) in the Battery Enclosure is in the OFF or STAND-BY position.

Install the enclosure plates.

Note: If a problem occurs, call Customer Support (see the back cover).

See also the Operation Manual located in the documentation storage area behind the front panel of the UPS and XR Battery Enclosure(s).

24

Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation

Page 28
Image 28
APC 10-40 KVA 380/400/415 V manual Post-Installation Checklist