Post-Installation Checklist
Use the following checklist to verify that the XR Battery Enclosure has been installed correctly:
Ensure that all busbars/cables between the XR Battery Enclosure(s) and the UPS are correctly installed.
Ensure that the DC breaker (if available) in the Battery Enclosure is in the OFF or
Install the enclosure plates.
Note: If a problem occurs, call Customer Support (see the back cover).
See also the Operation Manual located in the documentation storage area behind the front panel of the UPS and XR Battery Enclosure(s).
24 |