APC 10-40 KVA 380/400/415 V Prepare for Cables, Remove the front panel, Remove the top cover

Models: 10-40 KVA 380/400/415 V

1 32
Download 32 pages 51.01 Kb
Page 9
Image 9

Prepare for Cables

Remove the front panel

1.Turn the screw to the right to the unlocked position.

2.Pull the top of the front

panel away from the

UPS.

3. Lift the front panel free of the two slots at the bottom of the enclosure.

4.Lift the battery compartment cover free

of the two slots at the bottom of the enclosures (only in Japanese configurations).

Remove the top cover

1. Loosen the six screws of the top

UPS front view

XR Battery

cover (four at the front and two at

 

Enclosure

the back).

 

 

2. Lift up from the back and push forward to free the cover.

Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation

5

Page 9
Image 9
APC 10-40 KVA 380/400/415 V manual Prepare for Cables, Remove the front panel, Remove the top cover