Connect Power in Installations with Cables

Install power cables

See “Recommended cable sizes” on page 23.

Install power cables between the UPS and the XR Battery Enclosure.

1.In the UPS, feed the cable up through the conduit box or through the transparent cable route bracket (not shown).

2.Connect the Bat+, Bat-, and N cables to the busbars in the UPS.

3.Secure the cables to the perforated bracket with cable ties.

4.Equip the cable with conduits (if applicable).

5.In the XR Battery Enclosure, feed the cable up through the conduit box (if applicable) to the cable landing area.

6.Connect the (+) cable to busbar no. 1 (+), connect the N cable to busbar no. 4 (N), and the (-) cable to busbar no. 6 (-).

7.Secure the cable to the perforated bracket with cable ties.

8.Attach the top part of the conduit box (if applicable).

XR Battery Enclosure rear view

BAT

BAT

XR2

To

 

UPS rear view.

BAT

BAT

16

Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation

Page 20
Image 20
APC 10-40 KVA 380/400/415 V manual Connect Power in Installations with Cables, Install power cables