Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation20
Final Mechanical Assembly

Level the Enclosures (L-shaped Floor Anchoring

Brackets) and Install Batteries

Note: The leveling feet and the L-shaped floor anchoring bracets (reuse of transportation
brackets) are used in some configurations instead of the optional U-shaped floor anchoring
brackets described earlier in this manual.
Note: Verify that the installation has been electrically wired before setting the leveling feet.

Level the enclosures

Set the leveling feet to ensure that the UPS is completely horizontal when it is in its final operating
position. Use the wrench shipped with the UPS to adjust all four leveling feet from the front to the back,
and from the left to the right, until the pads make solid contact with the floor. Use a bubble level to check
that the enclosure is horizontal.
Caution: To avoid equipment damage, do not push or pull the UPS after the leveling feet
have been lowered.
.