352 mm (13.85 in) UPS system with the UPS placed to the left (seen from the front).

UPSXR1

XR2

N

+

1.Install the following baying kit busbars between the UPS and XR1:

880-1604 between the vertical busbar N on the UPS and busbar 3 on XR1

880-1604 between the vertical busbar (+) on the UPS and busbar 1 on XR1 880-0939 between the vertical busbar (-) on the UPS and busbar 6 on XR1

2.Install the following baying kit busbars between two XR Battery Enclosures: 880-0926 between the vertical busbar 4 on XR1 and vertical busbar 3 on XR2 880-0941 between the vertical busbar 2 on XR1 and vertical busbar 1on XR2 880-0940 between the vertical busbar 5 on XR1 and vertical busbar 6 on XR2

See “Connect the EPO” on page 19

Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation

15

Page 19
Image 19
APC 10-40 KVA 380/400/415 V manual See Connect the EPO on