352 mm (13.85 in) UPS system with the UPS placed to the right (seen from the front).
XR2
XR1
UPS
1.Install the following baying kit busbars between the UPS and XR1:
880-1604 between the vertical busbar N on the UPS and busbar 4 on XR1 880-0939 between the vertical busbar (+) on the UPS and busbar 1 on XR1 880-1604 between the vertical busbar (-) on the UPS and busbar 6 on XR1
2.Install the following baying kit busbars between two XR Battery Enclosures: 880-0926 between the vertical busbar 3 on XR1 and busbar 4 on XR2 880-0940 between the vertical busbar 2 on XR1 and busbar 1 on XR2 880-0941 between the vertical busbar 5 on XR1 and busbar 6 on XR2