Prepare for Floor-Anchoring (optional)

Note: If floor anchoring and battery securing is required, read this section. If not, see “Prepare for Cables” on page 5.

Note: Allow for enough working space behind the enclosure for electrical work to be carried out (e.g. if you want to install a conduit box or if you want to connect an XR Battery Enclosure at a later stage). Minimum rear clearance is 100 mm (3.93 in) and must comply with applicable national and local codes. 600 mm (23.6 in) is recommended.

Note: The L-shaped floor anchoring brackets that secured the enclosure to the pallet during shipment may be used for a stand-alone UPS enclosure to enhance stability. See this chapter for hole positions and see also “Level the Enclosures (L-shaped Floor Anchoring Brackets) and Install Batteries” on page 20. The L-shaped floor anchoring brackets are not necessary when baying enclosures together. Instead, the three U-shaped floor anchoring brackets from the baying kit are used.

Note: Hole positions are only intended as a guide.

System arrangements

APC recommends the following arrangements of UPS units and XR Battery Enclosures (XR) in parallel.

Examples with two parallel systems using baying kits.

UPS

XR

XR

XR

XR

UPS

XR

XR

XR

XR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

XR

XR

XR

XR

UPS

UPS

XR

XR

XR

XR

 

 

 

 

 

 

 

 

 

 

UPS XR XR

XR XR

UPS XR XR XR XR

2

Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation

Page 6
Image 6
APC 10-40 KVA 380/400/415 V manual Prepare for Floor-Anchoring optional, System arrangements