Install power cables between two XR Battery Enclosures.

1. Feed the cable up

through the conduit

box on XR1 or

through the

transparent cable

route bracket (not

shown) to the cable

connection area.

2. Connect the (-) cable

to busbar no. 5 (-), the

XR2 Battery Enclosure rear view

XR1 Battery Enclosure rear view

 

N cable to busbar no.

 

3 (N), and the (+)

 

cable to busbar no. 2

 

(+) in XR1.

3.

Secure the cable to

 

the perforated bracket

 

with cable ties.

4.

Equip the cable with

 

conduits (if

 

applicable).

5.

Feed the cable up into

 

the conduit box

 

(optional for 400 V

 

versions) on XR2.

6.

Connect the (-) cable

 

to busbar no. 6 (-), the

 

N cable to busbar no.

 

4 (N), and the (+)

 

cable to busbar no. 1

 

(+) in XR2.

7.

Secure the cable to

 

the perforated bracket

 

with cable ties.

8.

Attach the top part of

 

BAT

 

 

BAT

 

To XR3

BAT

BAT

the conduit box (if

applicable).

From UPS

Note: If you use floor anchoring, carry out the floor anchoring procedures now.

Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation

17

Page 21
Image 21
APC 10-40 KVA 380/400/415 V manual Feed the cable up