Secondary Installation
5.Place the bottom of the Left Log in the ledge at the front left of the burner and rest the middle of the log against the Left Rear Log Chunk as shown in Figure 56 and 57.
Figure 57: Log Placement of Center Log.
7.Check that the log set is laid out as shown in Figure 58 and install door.
Figure 56: Log Placement of Left Log.
6.Place the bottom of the Center Log in the ledge at the front center of the burner and rest the middle of the log against the top of the “Y” Log as shown in Figure 57 and 58.
Figure 58: Log Placement Complete.
33