Installation

Step 4: Connectivity Box

By this point, the base track, side ramps and end ramps must be securely fastened to the floor. To attach the connectivity box to the base track, follow these instructions:

4-1Reposition the connectivity box, in the correct orientation, over the pre-drilled holes in the base track (see instruction 3-3).

The end of the connectivity box that has three mounting holes faces back towards the track.

Using at least three of the provided 3/16" masonry screws, secure the box to the track and floor.

Remove all dust with a vacuum cleaner.

The end of the connectivity box with three mounting holes faces back towards the track.

Masonry

Screws

Secure connectivity box to the floor

12AVTrac • Installation

Page 14
Image 14
Extron electronic 42-122-xx manual Connectivity Box, Secure connectivity box to the floor