Optional Equipment (for qualified installers only) | 59 |
Duct Installation Instructions
Determine the route for the heat duct using the illustration below as a guide
NOTE:
Air flow through the duct is affected by length and number of bends. Keep the length and number of bends to the minimum to maximize performance.
Blower Box
When the duct penetrates the fireplace enclosure vertically and the top of the enclosure is within 36” of the top of the fireplace, a firestop spacer that maintains a 1/2” clearance between all sides of the duct and any combustible material must be used.
1/2”
| 0” Clearance to | |
| Combustibles | |
| (for intake air |
|
20’ Maximum | and exhaust) |
|
|
| |
Length |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Duct Adapter |
|
|
|
|
|
| Use 10” x |
(6” Round to 10” x |
|
|
|
|
|
| (duct) when passing |
included with the power heat |
|
|
|
|
|
| through tight areas. |
vent kit) |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Attach the blower box to the framing or floorboards of the home following the instructions below.
Wall or Ceiling Mounting
Cut a hole between wall a framing members for the
blower assembly.
b | Attach the wall mounting | c | Slide the blower, with |
brackets to the blower box. | wires, into the hole cut | ||
| in step "a". Attach | ||
|
|
| with four screws. |
16"*
Mount the bracket to these holes for 2 x 4 walls
Mount the bracket to these holes for 2 x 6 walls
*This blower was designed for framing on 16" centers. Construct additional framing if needed. If the blower is installed prior to the drywall only a 14" opening is required. If installed after the drywall is in place, the drywall to the sides of the blower will need to be patched.
© Travis Industries | 4080214 |