MMB Web-UI (Web User Interface) Operations

TABLE 1.59 [Schedule Control] Window Buttons

Buttons
Description
Apply
When the [Apply] button is clicked, the schedule operation information for the specified partition
is set.
Cancel
When the [Cancel] button is clicked, the browser returns to the original status without setting the
schedule operation information for the partition.
(1) Menu Operation
[Partition] [Schedule] [Schedule Control]
(2) Window Operations
1. Specifies whether schedule operation has to be carried out by Radio button for every partition.
2. Click the [Apply] button.
[Schedule list] Window
Up to 1000 instances of partition power On / Off schedule can be recorded in the [Schedule list] Window.

FIGURE 1.42 [Schedule List] Window

Schedule will appear in the order of the partition number.
Partition, will appear in chronological order of the start date of the period.
If the partition and the start date are the same, the schedule appears in the sequence in which it is listed.
Remarks
If the Type is Weekly, the start date is considered to be “Oneday”.
Only the partition to be managed can be operated for Partition Operator.