MMB Web-UI (Web User Interface) Operations
Message Number
Message
I_00013
Setting completed.
E_00100
Failed to set the System Setup
W_00426
Invalid values specified.
For details on the messages displayed on the window, see PRIMEQUEST 2000 Series Message Reference
(C122-E178EN).
1.7.7 [Power Control] Window
[Power Control] window displays the power control of the system.
Remarks
When the operating system supports ACPI (Advanced Configuration and Power Interface), the power can be
turned Off after the operating system is Shutdown by Power Off operation. If ACPI is not supported, power
can be Off without the Shutdown of the operating system. Moreover, even if the operating system supports
ACPI, and applications running on the operating system are not supported, sometimes power Off is not
possible. Since these depend on the specifications of the operating system and applic ati on s, for deta il s, refer
to the operating system and application specifications.

FIGURE 1.103 [Power Control] Window

1. Select the process executed for the system from Pull-down menu of [Power Control].
Then, click the [Apply] button.
Dialog box for confirmation appears.
2. Click the [OK] button to execute the process.
Click the [Cancel] button to cancel the process.
When sytem Power is On, or when Power is Off, and when the specified control is failed, Warning
dialog box appears.