3-4
Operating position Bar
Loading Documents on the ADF
NOTICE
Be sure to change the position of the shipping lock according to INSTALLATION AND
CONNECTION procedure before operation.
1
Lift the ADF paper chute up and
place the shaft in its operating
position.
Stacker
ADF ADF paper chute
Guide
Guide lever
ADF lever